Ironvale Logistics Hub is a 32,000 sqm distribution facility built on a brownfield site with full ground remediation, heavy-duty slab construction, and integrated automation infrastructure ready for the client's robotic systems.

Summary points:
  • Remediated 4.2 hectares of contaminated ground

  • 200mm reinforced slab rated for automated MHE

  • 42 dock-leveller bays with canopy protection

  • ESFR sprinkler and high-bay LED systems

The challenge

Constructing a fast-track warehouse without compromising structural integrity

Speed-to-operation was the client's priority. We adopted a design-and-build approach, with steel frame fabrication running parallel to ground works, compressing the programme by an estimated 14 weeks compared to a traditional sequence.

The slab specification was engineered specifically for the client's automated guided vehicle (AGV) routes, with laser-screed finishing achieving FM2 floor flatness across the entire footprint.

The challenge

Ironworker in safety harness standing on a high-altitude steel beam girder structure.

Site delivery

Phased logistics delivery

The hub was delivered in two operational halves, allowing the client to begin inbound logistics from one side while the second half was still being commissioned.

Milestone hits:
  • Groundworks & Remediation | Month 3: Site cleared and slab poured

  • Steel Frame & Envelope | Month 7: Building weathertight

  • M&E & Handover | Month 11: Full automation integration complete

Final Result

Phased operational openings

The client's automation partner began equipment installation in Month 8, running parallel to final M&E commissioning to accelerate go-live.

Delivery data:
  • 32,000 sqm | Total Warehouse Footprint

  • 42 | Loading Dock Positions

  • FM2 | Floor Flatness Achieved

Final Result

"Ironvale's pace, precision, and willingness to integrate with our automation team made them the ideal partner for a complex industrial build."

Tomás Reyna

Head of Network Operations

"Ironvale's pace, precision, and willingness to integrate with our automation team made them the ideal partner for a complex industrial build."

Tomás Reyna

Head of Network Operations

"Ironvale's pace, precision, and willingness to integrate with our automation team made them the ideal partner for a complex industrial build."

Tomás Reyna

Head of Network Operations

Final Result

Planning a logistics or industrial build?

If you need a warehouse, distribution centre, or production facility delivered on aggressive timelines without compromising structural quality, we can mobilise quickly.

Create a free website with Framer, the website builder loved by startups, designers and agencies.